Label pool
438 sheetsIncludes 5% planned extra stock. Buy 18 packs (10,800 labels).
$323.28 in label stock; toner and labor additional.
DRKNYT / Applied Sciences / TAGD products & production
Compare label inventory, moving-kit labor and 3D machine time before accepting orders.
Division edition 04 Updated October 30, 2026
Generated garage-lab concept, October 30, 2026. OpenAI image tool, directed in Codex by LUCIEN. This is an imagined research environment, not a photograph of an existing DRKNYT facility. Image-model version was not exposed.
Capacity planner · assumptions you can inspect
Compare scenarios independently. If the moving kits use the label pool, their labels are part of that pool; do not add both counts as separate demand.
Includes 5% planned extra stock. Buy 18 packs (10,800 labels).
$323.28 in label stock; toner and labor additional.
21 packs with 5% extra stock: $377.16.
41.7 hands-on hours · $1,042.71 at $25/hour, including 10% time reserve.
This exceeds the selected label pool by 2,000 labels.
7.5 kg material · 75 hours per printer across two machines.
Fits within the pair’s assumed 320-hour monthly schedule; actual production time still needs measurement.
Avery 22805: 24 labels/sheet, 25 sheets/pack, $17.96/pack. Stock gets a 5% extra allowance, rounded up to complete sheets/packs. Moving kits: 48 labels, 9.1 minutes hands-on plus 10% reserve, $25/hour before payroll burden. Parts: 25 g and 30 minutes each, plus 20% material/time; two printers at 160 scheduled hours each per month. No measured capacity, ink/toner consumption, retail price or margin is asserted.
The planner above keeps labels, 48-label moving kits and printed parts separate. Selecting a volume is a planning exercise; it does not reserve stock or establish measured capacity. If moving kits draw from the label pool, subtract their labels from that pool instead of adding them twice.
The label calculation uses Avery 22805 at $17.96 per pack of 600, 24 labels per sheet and 25 sheets per pack. It adds 5% extra planned labels for setup/reject stock and rounds up to complete sheets and packs. This reserve is a purchasing assumption, not a guaranteed 95% production yield. Avery stock and price
| Monthly example | Labels / sheets before extra stock | Packs with 5% extra stock | Label-stock cash |
|---|---|---|---|
| 10,000-label pool | 10,000 / 417 | 18 | $323.28 |
| 50,000-label pool | 50,000 / 2,084 | 88 | $1,580.48 |
| 250 moving kits | 12,000 / 500 | 21 | $377.16 |
| 1,000 moving kits | 48,000 / 2,000 | 84 | $1,508.64 |
A kit’s 48 labels consume about $1.44 of face stock before extra stock. Toner, card, sleeve, labor, overhead, outbound shipping and support are additional. Whole-pack purchasing cash differs from the material actually consumed. The invitation budget carries stock for 250 pieces and 300 provisional mailers; those mailers do not fit unfolded Letter moving-kit sheets.
The selected laser printer’s replacement toner set still needs a valid quote and a final-art coverage measurement. The Epson opening replacement set is budgeted at $151.74; this is one set, not a monthly ink forecast. Measure printed coverage and cleaning consumption. Do not translate advertised test-page yields directly into TAGD kits.
The moving-kit labor model is 1.5 minutes load/retrieve, 3 minutes inspect/reconcile, 2 minutes collate, 2 minutes pack and 0.6 minute allocated batch setup: 9.1 minutes per kit, plus 10% time reserve. The illustrative $25/hour excludes payroll burden and design/support. Validate the inspection method and actual time before setting a price.
The model assumes a 25 g part taking 30 minutes, plus 20% extra material and scheduled time. It omits geometry-specific supports and multicolor waste. The planner compares two machines at 160 scheduled hours each per month; available operator coverage and measured bed utilization determine the real limit. Material-only cost is not finished-part cost.
The earlier ring proposal tests these offers in ; they are not current selling prices or evidence of demand. Bottle excluded, shipping separate.
| Proposed offer | Price to test |
|---|---|
| One personalized top: name/number, color and one bottle-specific code | $14.95 |
| Standardized team order, at least 10, individual names/codes and one delivery | $11.95 each |
| Top plus matching bag tag, separate object identities | $24.95 |
The original illustrative $3.55 model already includes the following production and packing allowances. It assumes fit development is complete and a repeatable process; no timed production run validates it yet.
| Original unit assumption | per top |
|---|---|
| 15 g total filament including allocated waste, at $30/kg | $0.45 |
| Machine time, electricity and maintenance allowance | $0.60 |
| Printed code/name face | $0.50 |
| Backing card and packaging | $0.50 |
| Three minutes of hands-on work at $20/hour | $1.00 |
| Additional reject/rework allowance | $0.50 |
| Illustrative production and packing total | $3.55 |
At $14.95, subtracting $3.55 and an assumed $0.75 payment fee leaves $10.65 before other costs. That is not net profit. Shipping, development, safety testing, software/support, returns, overhead and taxes remain outside that calculation; $0.75 is an illustrative fee, not a current processor quote. If hands-on work takes 10 minutes at the same $20/hour, the unit model becomes about $5.88, leaving about $8.32 before those other costs at the same price and fee assumption. The earlier roughly $3–$5 production/packing target is a test objective, not an achieved cost.
This ring-specific model uses 15 g, three minutes and $20/hour. The planner above uses a generic 25 g / 30-minute machine-time part, while moving-kit labor uses 9.1 minutes plus reserve at $25/hour. These are different scenarios. Do not combine their time, mass, waste or labor assumptions into a ring margin, or claim the planner establishes ring throughput. Replace the ring assumptions with measured first-article and repeat-batch results before deciding a selling price.
The proposed 25-token Earth Edition is a separate experiment. Quote and measure its body/finish, code face, numbering, envelope/opening card, any optional box, personalization, assembly, inspection, rejects and digital operation/support. A roughly two-inch medallion has no measured mass, machine time or approved metal process here. Neither the Bottle ID's $14.95 price test/$3.55 example nor the planner's generic 25 g / 30-minute part establishes Relay's price, cost or throughput. No Relay selling price or forever-hosting allowance is included in those figures.
For every product, keep landed stock cash, consumed materials, labor, machine-hours, rejects, packaging, delivery, maintenance, software/support and expected returns. Allocate equipment depreciation and room overhead across realistic accepted units. A retail price or margin is not established by these planning inputs. Reconcile one measured batch before quoting dependable unit economics.