MenuClose
Applied Sciences DivisionResearch → Prototype → Proof

DRKNYT / Applied Sciences / Equipment request

Help put dependable tools in place.

Review a one-time contribution or equipment sponsorship, continue to secure checkout when available, or offer equipment directly to the lab.

Division edition 05 Updated November 4, 2026

Inside the imagined lab · Image details

Generated garage-lab concept, October 30, 2026. OpenAI image tool, directed in Codex by LUCIEN. This is an imagined research environment, not a photograph of an existing DRKNYT facility. Image-model version was not exposed.

Phase 1 · Put the tools in place

Help keep the work moving.

Phase 1 equipment fund

A 64GB Mac Studio with 1TB of solid-state storage, plus backup power for a controlled shutdown.

Funds raised
$0.00
Equipment goal
$4,291.93
Still needed
$4,291.93

U.S. dollars · Goal includes a 6% tax allowance. The online total is unavailable here. Showing the manual starting balance recorded October 30, 2026. Pledges and equipment offers are excluded.

Build Dreamlab in phases

A clear purpose for every contribution.

We’re starting with the working computer and backup power. Each later area needs its own budget, target and contribution terms before it opens. A contribution here supports Phase 1; it is not a payment toward the whole imagined lab.

  1. 01

    Working computer and backup power

    64GB Mac Studio, 1TB storage and battery backup. Estimated goal: $4,291.93, including a 6% tax allowance. The progress above belongs to this phase.

    Current phase · availability shown at checkout
  2. 02

    Production workshop

    Make TAGD identifiers, invitations, labels, packaging and prototypes in house. The $11,450 planning envelope needs supplier quotes and remaining setup costs before it becomes a funding target.

    Planning · not open for contributionsExplore the workshop plan →
  3. 03

    Research computing and continuity

    Additional computing, storage, networking and a verified backup plan. We’ll first credit the equipment already funded in Phase 1 so it is not funded twice.

    Scope and budget to be set
  4. 04

    The space and device testing

    Room layout, displays, seating, equipment protection and the devices needed for specific tests. Measurements, installation and operating costs come before a target.

    Scope and budget to be setExplore the Dreamlab experience →

The retained $94,296.81 Dreamlab scenario is a historical equipment estimate, not a combined campaign goal or the price of a finished room. Its computer, power and device costs overlap these areas. We will reconcile those costs before opening another phase. Later-phase progress will be published separately when funding opens.

A practical way to help

Put the next tools within reach.

Phase 1 · Working computer and backup power. Contribute to this phase, choose a preferred item to support, or offer equipment for us to review. Later phases have separate scopes and are not open for contributions yet.

Checking online contribution availability…

How would you like to help?

Item amounts are the dated estimates before tax and shipping. Your item choice records a preference within the equipment fund; it does not purchase or reserve the item for you.

Prefer to arrange support directly?

Prepare an email for the lab to review. A message is an offer of support; it does not take payment.